![]() |
Occupancy:
Vacant factoryConstruction:
Four story 200' x 200' Heavy timber (mill) constructionFire Location:
Top floor fully involved and through the roof
1. Destination of first attack hose line?_________________________
2. Destination of second hose line?_________________________
3. Portable ladder position?_________________________
4. Primary ventalition?_________________________
5. Aerial ladder position?_________________________
6. Primary life hazard location?_________________________
7. Interior fire spread problem?_________________________
8. Exterior fire spread problem?_________________________
9. Collapse hazard?_________________________
10. Worst case scenario?_________________________
Note #1: FDNY "Fireground" designation system (clockwise) 1. is the street 2. is the left side ( as you face the front of the building) 3. is the rear. 4. is the right side.
Note #2: FDNY "Fire Building" designation system for row store/dwellings
Occupancies to the left of fire occupancy: Exposure #2; #2A; #2B; etc.
Occupancies to the right of fire occupancy: Exposure #4; #4A; #4B; etc.